Damian's  
Started by enlarging hole in side of engine bay and moved fuse box forward.  Covered edges of hole in rubber. Already had a 5 inch flexy duct connected to brake duct to channel air in

Started by enlarging hole in side of engine bay and moved fuse box forward. Covered edges of hole in rubber. Already had a 5 inch flexy duct connected to brake duct to channel air in


Powered by Gallery v1 RSS